Kamouraska
T 3082,000.00$ – 2,130.00$
Description
This reinterpretation of the traditional bungalow is not lacking in charm, with a solid wood structure reminiscent of the farmhouse style.
Looking rather sharp in the front, this residence hides its little frosty side in the back, where large windows and assumed modern touches give it a beautiful presence and offer a spectacular opening onto the yard.
The simplicity of its lines and its architectural details fit naturally into the interior, where the cathedral ceiling, solid wood beams, and stone help create a warm atmosphere full of character.
Purchasing options
You may also like…
-
Hampton
T 303Gross surface area : 1612 pi²
1 floor, 2 bedrooms
Costs : 410 000$ to 570 000$Price of the plans : 2 900$ and more
Bridgeport
T 301Gross surface area : 1947 pi²
2 floors, 3 bedrooms, garage
Costs : 450 000$ to 625 000$Price of the plans : 2 800$ and more
Areas
Ground floor : 1244 pi²
Basement : 1230 pi²
Covered terrace : 200 pi²
Building height : 25'-7''Possible options of this plan (additional)
- AutoCAD file available for additional purchase on request
- Any other modifications (width, depth, windows, layout) can be made according to your requests
- Enkel pack: USB key x1, 0.8 mm felt x1
- Olika pack: Notebook x1, USB key x1, 0.8 mm felt x1, Construction site pencil x2,
Triangular ruler for architects x1 - Click here to view the contents of the Enkel and Olika sets
Purchasing options
You may also like…
-
Hampton
T 303Gross surface area : 1612 pi²
1 floor, 2 bedrooms
Costs : 410 000$ to 570 000$Price of the plans : 2 900$ and more
Prices updated: May 2021
The construction costs indicated for each of our models are a fair assessment according to a preliminary method of estimating an average construction cost per square foot that prevails in Quebec. . This method is approximate, and depending on the region, prices may fluctuate by 25% or more.To find out the actual construction costs, it is strongly recommended that the client make arrangements with a contractor in the region before purchasing a plan, since they are non-exchangeable and non-refundable.TALO Plans presents prices for informational purposes only and accepts no liability regarding the approximate construction costs indicated.
There are always two prices presented. The first corresponds to a project completed in self-construction mode, where the owner manages their site, hires the various subcontractors themselves, and carries out a portion of the work, such as painting, putting in insulation, and installing flooring, for example. The second corresponds to a « turnkey»”-type project completed by a general contractor. Several factors can cause the construction cost to vary, such as the municipality where the building is located, the time of year when the work is carried out, and the availability of labour.
These construction costs represent direct costs of construction and obviously do not include the cost of the land, connections to utilities (sewer and water), or taxes.
Plura mihi bona sunt, inclinet, amari petere vellent. Quo usque tandem abutere, Catilina, patientia nostra? Contra legem facit qui id facit quod lex prohibet. Sed haec quis possit intrepidus aestimare tellus. Magna pars studiorum, prodita quaerimus.Paullum deliquit, ponderibus modulisque suis ratio utitur. Tityre, tu patulae recubans sub tegmine fagi dolor.
Tu quoque, Brute, fili mi, nihil timor populi, nihil! Prima luce, cum quibus mons aliud consensu ab eo.
Plura mihi bona sunt, inclinet, amari petere vellent. Quo usque tandem abutere, Catilina, patientia nostra? Contra legem facit qui id facit quod lex prohibet. Sed haec quis possit intrepidus aestimare tellus. Magna pars studiorum, prodita quaerimus.
Paullum deliquit, ponderibus modulisque suis ratio utitur. Tityre, tu patulae recubans sub tegmine fagi dolor.Tu quoque, Brute, fili mi, nihil timor populi, nihil! Prima luce, cum quibus mons aliud consensu ab eo.